The panels ranged from 3t to 22.68t in weight, 830mm to 7500mm in width and 8230mm to 8580mm in height. The size of the largest panels ruled out precast as an option. CCC supervisor Sam Smith undertook extensive on-site liaison with the builder and Fine Form Precast (which was engaged by the builder to form …
Cranes and Lifting (Nov/Dec): The Top 50
Here at Cranes and Lifting, one of priorities is to champion and recognise the industry and it is hope that this list does that as well as help inform the sector and identify trends. Now, thisRead More
Case study: tackling a huge bridge lift on the Pacific Rim of Fire
A heavy jacking system – the same deployed across Australasia – has demonstrated its power, precision, and safety by removing more than a kilometre of high bridge spans in the US in recordRead More
Towering achievement for Sydney Metro Northwest
The two towers for Sydney Metro’s iconic cable-stayed railway bridge over Windsor Road at Rouse Hill were erected recently. The 270-metre bridge – the first of its type in Australia –Read More