-->
Cranes & Lifting, Features, International, Online Subscription

Case study: tackling a huge bridge lift on the Pacific Rim of Fire

Case study: tackling a huge bridge lift on the Pacific Rim of Fire
A heavy jacking system – the same deployed across Australasia – has demonstrated its power, precision, and safety by removing more than a kilometre of high bridge spans in the US in record time. Burkhalter Rigging Inc used the world’s tallest Enerpac JS-10 multi-point incremental Jack-Up system to remove 14 bridge sections, each of 87.78m, …
To access this post, you must purchase Individual Subscription, 30 User Subscription, 30 Days Free Trial or 5 User Subscription, If you have an existing subscription, please log in here.
Send this to a friend